system design       

stage two

 

 

 

We start by listing everything you want each automated system to do.  Then our system designer begins working with the Architect to establish wire specs, equipment housing, room aesthetics, lighting and sound components, control panel placement and more.  We also assess all existing components and decide what new equipment is needed.  Finally, component integration is planned and touch panels are programmed with the graphical interface of the clients choice.  Upon approval, final drawings are issued for construction and wiring begins at the appropriate coordinated times.

 

      room specs.                                          power requirements             projector system

              wiring specs.                     audio system            lighting control

  equipment housing         room seating                                          system design      detail

 

previous next

© c a d o l o g y     i n t e g r a t o r s    2 0 0 5                         k n u g e n t @ i c a d o l o g y . c o m